Main Street Phase VI – Leyte Drive To Day Road – Added Travel Lanes

The City of Mishawaka Indiana

Cost: $5,400,000

More About This Project

Category: Transportation

Lawson-Fisher Associates was selected by the City of Mishawaka to design the Main Street Phase VI project. The project began as a pavement overlay and widening project that evolved during the design phase a full pavement replacement project. This significant design change and project modification resulted from two primary needs: an evaluation of the existing sewer system and an increased emphasis on the corridor as the City moves forward.

Lawson-Fisher Associates researched a radar traffic signal detection system, an LED street lighting system, and provided extended traffic signal shop drawing review. Lawson-Fisher Associates was responsible for survey, utility coordination, roadway design, storm sewer evaluation and design, signing and pavement marking design and traffic signal design.