WATER RESOURCES

 

Lake George Dam

City of Hobart

Hobart, Indiana

The Lake George Dam suffered extensive damage to its earthen embankment portions during flooding and was in very poor condition.  Since the Lake George Dam was classified as a “High Hazard” dam, the State of Indiana required that improvements to the dam meet the highest level of criteria including passing the full Probable Maximum Precipitation (PMP) rain event.  LFA was requested by the City to perform a Preliminary Engineering Report addressing the concerns and propose improvements to the dam.  In addition, LFA provided the design, contract documents, permitting requirements and construction inspection for the successful completion of this project.

our mission

vision

© LAWSON-FISHER P.C. 2017

To provide high quality professional engineering services through

client collaboration, tailoring solutions that achieve their goals while enhancing quality of life.

To be the premier consulting engineering firm enhancing valued relationships  through insight and understanding while investing
in professional development and
individual opportunities.

INNOVATIVE CIVIL ENGINEERING SOLUTIONS & SERVICES

525 WEST WASHINGTON AVENUE • SOUTH BEND • 574-234-3167