Did you know LFA designed the signalization and grade improvements at the Ireland Road/Locust Road intersection?

Sight distance deficiencies in addition to the location of two single family homes immediately north of the intersection required attention. Meeting the homeowners needs, focus was placed on the relocation and reconfiguration of the existing drives to allow garage usage.

Concrete modular block retaining walls were built to overcome the proposed elevation difference fulfilling the project’s needs.

Intersection During Construction

This project also included coordination with two ARRA INDOT bridge replacements immediately north and east of its limits.

LFA was solely responsible for roadway design, drainage design, pavement markings and signing, lighting, signalization, right-of-way engineering, maintenance of traffic, and construction inspection.